What a publication must be when it goes out (PDF/X-4 on a coated profile, A4 with three millimetres of bleed, the house fonts only, pictures at 300 ppi, every product field filled, signed off by the art desk) used to live outside the document, in a brief or on a printer’s spec sheet. The editor checked it once, at export.
Since 14 November a document can carry those requirements itself. The publication contract is stored in the file, so a .paged save and an IDML export both keep it; InDesign keeps the label and ignores it. It names the PDF standard, the trim size every page must have, the least bleed, the output intent, whether RGB pictures are allowed, which font families are, the least effective resolution, whether the data must be complete, and where the approval stands. Every change to it is one undo step.
One checker, not two
The assessment does not reimplement the export’s checks. It runs the same readiness check the PDF export runs, on the contract’s standard, and adds only what the contract promises beyond it. A missing font becomes a blocker when the contract asks for every font. A requirement not met is a blocker; the export’s warnings stay warnings.
The floorThe export's 150 ppi threshold gives way to the contract's own resolution floor.
The floor
It runs continuously, from what the document reports as it changes. Its verdict, Blocked, Needs attention, Ready or Approved, sits in the header beside the save status; its tooltip lists what is not met, and a click opens the contract. A requirement that Publication health does not already report, such as a page of the wrong size, becomes an issue on that page, with the panel that fixes it.
Nothing is changed to meet the contract.
Approval is something you do
Request review, Approve, Request changes and Back to draft are buttons, and each is one undo step that records who and when. Approve is not offered while the contract is blocked. Approving keeps the approved state as a named checkpoint, “Approved”, on the document’s timeline, so Compare with current can show what changed since. An edit after the approval reads “Approved, then edited” and needs attention again.
A contract is made from the document in front of you: Window, Output, Publication contract, then Create from this document takes its standard, its first page’s size, its bleed and output intent, and asks for every font, 300 ppi and complete data, as a draft to edit in place.
One limit is written down with it. “Approved, then edited” is known within a session; across sessions, the checkpoint and the comparison say what changed. The end-to-end test resizes a page and expects the readiness to block with an issue on that page, then expects Undo to make it ready again, and Approve to be one undo step that keeps the checkpoint.